High failure costs
Unplanned downtime causes high costs. Clear fault patterns, however, are often difficult to isolate during operation.
SF2 Edge Challenge
Evaluate your use case in the SF2 Edge Challenge. Submit your time-series data for a complimentary evaluation. We analyze your sensor streams for subtle process drift and early fault signatures—fully confidential, air-gapped, and purely signal-based.
Challenge
Unplanned downtime causes high costs. Clear fault patterns, however, are often difficult to isolate during operation.
Time series, SCADA, and log data are plentiful - but rarely cleanly labeled or directly interpretable.
For the initial validation, anonymized technical data without confidential company details is sufficient.
If you have a demanding or unsolved use case, we start with your technical objective and available sensor or process data. Together, we verify which machine states, subtle transitions, and early state changes can be reliably detected – long before deciding on a production rollout. You can start with an anonymized dataset, or keep sensitive data completely inside your network.
Product previews of Application
ProductionMechanical EngineeringEnergyWaterProcess industrySemiconductor ManufacturingPumpsTurbinesOT / SCADA
Procedure
You briefly outline the system, the issue, and existing data channels.
We clarify together which data format is sufficient for an initial analysis.
SF2 Systems generates state fingerprints and identifies relevant changes.
We show transparently what is technically recognizable in the dataset.
If the use case holds, we define a proof of value, an edge pilot, or the next implementation step.
Outline your machinery and available data sources. Your submission is non-binding, requires no disclosure of proprietary trade secrets, and creates no obligation for future data sharing.
Note: No raw data is uploaded during this initial step. Following our initial review, we will provide a secure, encrypted upload link if required.
Outlook
We review your description and assess the technical feasibility.
We jointly discuss objectives, data situation, and framework conditions.
Data exchange is initiated only after you review and approve the setup.